Rajasthan · 120 MW solar cleaning deployment

Project profile · Autonomous

Rajasthan · 120 MW

Larger arid park on Fully Automatic fleets. Telemetry keeps cycle completion visible to the O&M team.

Location
Rajasthan
Project scale
120 MW
System
Fully Automatic
Operating model
Scheduled cleaning windows

A cleaning workflow engineered around the array.

Larger arid park on Fully Automatic fleets. Telemetry keeps cycle completion visible to the O&M team.

01 / Challenge

What the O&M team needed to solve

120 MW of table length cannot be mopped uniformly. Water is limited.

02 / Response

How the cleaning model was configured

Autonomous dry-clean fleet with scheduled windows and field service for exceptions.

From survey to repeatable clean cycles

  1. 01

    Survey array geometry, access, and operating constraints

  2. 02

    Configure the cleaning system for the approved project pack

  3. 03

    Commission the workflow and hand over operating checks

01

Site engineering

Map table geometry, access, operating constraints, and the cleaning cadence before equipment is committed.

02

Commissioning

Configure the robot workflow, validate safe passes, and document the approved operating sequence with the site team.

03

O&M handover

Train operators, define routine checks, and establish escalation and field-service support for exceptions.

What changes for the site team

  • Park-scale cadence instead of campaigns
  • Dry-clean default