What the O&M team needed to solve
Multiple roofs, parapet edges, and no space for rails. Mopping was slow and inconsistent.

Project profile · Manual-Guided
Commercial rooftop portfolio cleaned with portable Lift & Shift robots — no permanent rail on occupied buildings.
The site brief
Commercial rooftop portfolio cleaned with portable Lift & Shift robots — no permanent rail on occupied buildings.
Multiple roofs, parapet edges, and no space for rails. Mopping was slow and inconsistent.
Operator-guided Lift & Shift units shared across rooftops, dry/wet as soiling required.
Deployment scope
Survey array geometry, access, and operating constraints
Configure the cleaning system for the approved project pack
Commission the workflow and hand over operating checks
Delivery model
Map table geometry, access, operating constraints, and the cleaning cadence before equipment is committed.
Configure the robot workflow, validate safe passes, and document the approved operating sequence with the site team.
Train operators, define routine checks, and establish escalation and field-service support for exceptions.
Operating outcomes