Gujarat · 120 MW solar cleaning deployment

Project profile · Rail-Assisted

Gujarat · 120 MW

Large ground-mount site using rail-assisted Semi-Automatic robots for repeatable row coverage under operator supervision.

Location
Gujarat
Project scale
120 MW
System
Semi-Automatic
Operating model
O&M supervised shifts

A cleaning workflow engineered around the array.

Large ground-mount site using rail-assisted Semi-Automatic robots for repeatable row coverage under operator supervision.

01 / Challenge

What the O&M team needed to solve

Plant scale outgrew portable units. Coverage quality varied when crews mopped long tables by hand.

02 / Response

How the cleaning model was configured

Table-edge rails and Semi-Automatic robots for supervised, consistent passes across priority blocks.

From survey to repeatable clean cycles

  1. 01

    Survey array geometry, access, and operating constraints

  2. 02

    Configure the cleaning system for the approved project pack

  3. 03

    Commission the workflow and hand over operating checks

01

Site engineering

Map table geometry, access, operating constraints, and the cleaning cadence before equipment is committed.

02

Commissioning

Configure the robot workflow, validate safe passes, and document the approved operating sequence with the site team.

03

O&M handover

Train operators, define routine checks, and establish escalation and field-service support for exceptions.

What changes for the site team

  • Repeatable row coverage vs ad-hoc mopping
  • Higher throughput than portable Lift & Shift
  • Operator still in control of transfers